Roles & Responsibilities

    Technical Lead Responsibilities

    The Tech Lead drives the investigation. They form hypotheses, direct diagnostic work, evaluate evidence, and recommend mitigations to the IC. They're the incident's chief detective - responsible for finding the problem while the IC manages everything else.

    The Tech Lead's Core Loop

    The Tech Lead runs a continuous hypothesis-test-evaluate cycle. They start with the available signals (alerts, metrics, logs, recent changes), form hypotheses about what's wrong, assign investigation tasks to engineers, evaluate the results, and either confirm or eliminate each hypothesis. This loop runs until the root cause is identified or a mitigation is found.

    THE INVESTIGATION CYCLE

    OBSERVEWhat signals are we seeing? What changed recently? What's the blast radius?
    HYPOTHESIZEBased on signals, what are the 2-3 most likely causes? Rank by probability and testability.
    TESTAssign each hypothesis to an engineer. 'Sarah, check if the deploy at 14:00 correlates with error onset. James, check database connection pool saturation.'
    EVALUATEDid the evidence support or refute the hypothesis? Narrow the field. Report to IC.
    RECOMMENDWhen evidence points to a cause: recommend mitigation to IC. 'I believe the root cause is X. I recommend we Y. ETA: Z minutes.'

    Hypothesis Board Management

    The Tech Lead maintains a mental (or written) hypothesis board. This is the structured tracking of what the team thinks might be wrong, ordered by likelihood and testability. During status rounds, the Tech Lead reports from this board.

    HYPOTHESIS BOARD EXAMPLE

    HYPOTHESIS BOARD - INC-2024-0847 - 14:30 UTC
    
    H1: [INVESTIGATING] Deploy v2.3.1 introduced regression
        Evidence: Error onset correlates with deploy time (14:02)
        Assigned: @sarah - checking diff and error signatures
        ETA: 5 min
    
    H2: [INVESTIGATING] Database connection pool exhaustion
        Evidence: Connection count at 95% capacity
        Assigned: @james - checking pool metrics and slow queries
        ETA: 10 min
    
    H3: [QUEUED] Third-party payment API degradation
        Evidence: Some timeout errors in payment service logs
        Assigned: Pending - will investigate if H1/H2 ruled out
    
    H4: [ELIMINATED] CDN misconfiguration
        Evidence: CDN metrics nominal. Ruled out at 14:20.

    The hypothesis board prevents tunnel vision (pursuing one theory while ignoring others), ensures parallel investigation, and gives the IC a clear picture of investigation progress.

    Key Responsibilities

    Own the technical investigation - you decide what to investigate and in what order
    Assign diagnostic tasks to engineers with clear scope and time boxes
    Report investigation status to the IC at every status round
    Recommend mitigations to the IC - 'I recommend we roll back' not 'should we roll back?'
    Separate investigation from mitigation - find the cause, but don't delay mitigation
    Identify when you need additional expertise and tell the IC who to page
    Document technical findings in the incident channel for the postmortem
    After resolution, own the technical section of the postmortem write-up

    Investigation vs. Mitigation

    A common failure mode: the Tech Lead insists on finding the root cause before mitigating. This is almost always wrong during an active incident. The priority sequence is:

    1

    Mitigate customer impact

    If rolling back fixes it, roll back. You can investigate the root cause after customers stop being affected.

    2

    Stabilize the system

    Even if the root cause is unknown, reduce blast radius. Feature flags, traffic shifting, scaling - buy time.

    3

    Identify root cause

    Once impact is mitigated, investigate why it happened. This informs the permanent fix.

    4

    Implement permanent fix

    This happens post-incident. Don't try to build the perfect fix during a SEV-1.

    Tech Lead Anti-Patterns

    The Solo Investigator
    The Tech Lead who does all the investigation themselves instead of delegating. This creates a bottleneck and wastes available engineers. Your job is to direct the investigation, not do all of it.
    Root Cause Tunnel Vision
    Spending 45 minutes chasing a theory while customers are impacted. If a quick mitigation is available (rollback, feature flag), recommend it to the IC immediately while continuing to investigate.
    Hypothesis Hopping
    Jumping between theories every 5 minutes without letting any investigation complete. Give each hypothesis enough time to produce evidence before moving on.
    Technical Monologue on Bridge
    The Tech Lead who gives a 10-minute detailed technical explanation on the bridge. Keep bridge updates to 30 seconds: 'Investigating two hypotheses. Most likely cause is X. Testing now. ETA 10 minutes.'