Roles & Responsibilities

    Operations Lead Responsibilities

    The Operations Lead owns the execution of infrastructure changes during an incident. They're the hands on the keyboard for rollbacks, scaling, failovers, and configuration changes - operating under the IC's direction with the Tech Lead's guidance.

    The Ops Lead's Core Function

    In many organizations, the Operations Lead and Tech Lead are combined into a single role. This works for smaller incidents but breaks down during SEV-1s where investigation and execution compete for the same person's attention. The Ops Lead exists to separate "figuring out what to do" from "doing it."

    The Ops Lead takes direction from the IC on what actions to execute and from the Tech Lead on how to execute them. They confirm before acting, announce what they're doing, and report outcomes. Every infrastructure change during an incident flows through the Ops Lead.

    Responsibilities During an Active Incident

    Execute Mitigations

    Perform rollbacks, configuration changes, scaling operations, failovers, and DNS changes as directed. Always announce before executing: 'I'm about to roll back deploy v2.3.1. Confirm?' Wait for IC or Tech Lead confirmation.

    Monitor Execution Outcomes

    After every action, monitor the immediate outcome. Did the rollback succeed? Are metrics recovering? Report back within 2 minutes: 'Rollback complete. Watching error rates - they're dropping. 5xx rate from 45% to 12% and falling.'

    Maintain Runbook Compliance

    If a runbook exists for the current scenario, follow it. If the runbook doesn't match reality, announce the deviation: 'Runbook says to restart service X, but the pod is in CrashLoopBackOff. I need guidance.'

    Track Infrastructure State

    Maintain awareness of current infrastructure state: what's been changed, what's in progress, and what the rollback path is for each change. Post this to the channel after each action.

    Coordinate with Adjacent Teams

    If the mitigation requires action from another team (DBA, network, cloud provider), coordinate directly. Keep the IC informed of dependencies and blockers.

    Prepare Rollback Plans

    Before executing any forward-fix, have the rollback plan ready. If the fix doesn't work, how do we undo it? How long will the undo take?

    The Action-Announce-Confirm Pattern

    Every operational action during an incident follows a three-step protocol. This prevents accidental changes, ensures the Scribe captures what happened, and gives the IC an opportunity to redirect if the action doesn't match the current plan.

    ACTION-ANNOUNCE-CONFIRM PROTOCOL

    1. ANNOUNCE
    Ops Lead: 'I'm going to [specific action]. This will [expected outcome]. Rollback plan is [plan]. Confirm?'
    2. CONFIRM
    IC/Tech Lead: 'Confirmed. Go ahead.' or 'Wait - let me check something first.'
    3. EXECUTE + REPORT
    Ops Lead: 'Executing now.' ... '[Time]: Action complete. Observing [metrics]. Initial result: [outcome].'

    Change Tracking During Incidents

    Every change made during an incident must be tracked. This is non-negotiable. Post-incident, the team needs to know exactly what was changed, in what order, and what the outcome was. The Ops Lead maintains a running log:

    CHANGE LOG FORMAT

    [14:32 UTC] CHANGE: Rolled back api-service from v2.3.1 to v2.3.0
      Reason: Suspected cause of elevated 5xx errors
      Method: kubectl rollout undo deployment/api-service
      Result: Successful. Pods healthy. Error rate dropping.
      Reversible: Yes - forward-deploy v2.3.1
    
    [14:47 UTC] CHANGE: Scaled api-service from 10 to 20 replicas
      Reason: Request queue depth still elevated despite rollback
      Method: kubectl scale deployment/api-service --replicas=20
      Result: Successful. Queue depth normalizing.
      Reversible: Yes - scale back to 10

    When the Ops Lead Should Push Back

    The Ops Lead has an obligation to push back on actions they believe are unsafe, even under IC direction. The IC has authority, but the Ops Lead has expertise about operational risk.

    SCENARIO: IC asks to deploy a fix that hasn't been tested
    RESPONSE: Flag the risk: 'I can deploy this, but it hasn't been through staging. If it fails, we'll be in a worse state. Can we test for 5 minutes first?'
    SCENARIO: Two conflicting changes are requested simultaneously
    RESPONSE: Surface the conflict: 'If I scale up while also changing the config, I won't know which one fixed it. Can we do one at a time?'
    SCENARIO: An action could cause data loss
    RESPONSE: Escalate immediately: 'This action could result in data loss. I need explicit confirmation from the IC and Tech Lead before proceeding.'
    SCENARIO: The rollback plan is unclear
    RESPONSE: Clarify before acting: 'I don't have a clear rollback for this change. If it goes wrong, our options are [X]. Is that acceptable?'